Skip to main content

Lean Management – Tools


5S+1
Seiri (Sort)
Seiton (Simplify)
Seiso (Sweep)
Seiketsu (Standardize)
Shitsuke (Sustain)
+
Safety
Seiri
√ Sort
√ Necessary vs. unnecessary
√ Right quantity when needed
√ Tagging
√ Cost
√ Example
Seiton
√ Set in order
√ Quick access
√ Efficiency
√ Organize/Labeling
√ Frequency of use
√ Visual
√ A place for everything and everything in its place
Seiso
√ Clean
√ Mess prevention
√ Shine and check
√ Causal analysis
√ Cleaning schedule
√ Cleanliness campaign
Seiketsu
√ Standardization
√ Cleanliness
√ Tools
√ Visual controls
√ Prevention
√ Identical workstations
√ Preventive maintenance
√ Implementation steps
Shitsuke
√ Discipline
√ Sustain
√ Habit
√ Rules
√ Tools
√ Standards
Safety
√ Uncluttered workplace
√ Well maintained equipment
√ Clean workspace


Value Stream Mapping
√ Flow of inventory and information
√ Identify and eliminate waste
√ Value as defined by customer
√ Optimum value
√ Identify value stream
√ Current state
√ Future state
Kaizen Blitz
√ Kaikaku (Japanese word)
√ Kaizen in short timescale
√ Focused events
√ Rapid improvement
√ Small improvements
Takt
√ Takt time
√ ull scheduling
√ Customers buying rate
√ TAKT time formula
√ Efficiency
Jidoka
√ Quality at source
√ Autonomation (Intelligent automation)
√ Required quantity
√ Product defects
√ Process malfunctions
√ Alerting
Poka Yoke
√ History
√ Mistake proofing
√ Defect prevention
√ Three types (Contact, fixed value, motion)
√ Implementation in manufacturing
√ mplementation in service
Summary
√ 5S + 1
√ Value-stream mapping
√ Kaizen, and kaizen blitz
√ Takt, jidoka, kanban
√ Poka-yoke
√ SMED

To be Continue

Comments

  1. Halo,I'm Helena Julio from Ecuador,I want to talk good about Le_Meridian Funding Service on this topic.Le_Meridian Funding Service gives me financial support when all bank in my city turned down my request to grant me a loan of 500,000.00 USD, I tried all i could to get a loan from my banks here in Ecuador but they all turned me down because my credit was low but with god grace I came to know about Le_Meridian so I decided to give a try to apply for the loan. with God willing they grant me  loan of 500,000.00 USD the loan request that my banks here in Ecuador has turned me down for, it was really awesome doing business with them and my business is going well now. Here is Le_Meridian Funding Investment Email/WhatsApp Contact if you wish to apply loan from them.Email:lfdsloans@lemeridianfds.com / lfdsloans@outlook.comWhatsApp Contact:+1-989-394-3740.

    ReplyDelete

Post a Comment

Popular posts from this blog

Plan >> Do >> Check >> Act >> (PDCA)

The plan–do–check–act cycle (Figure 1) is a four–step model for carrying out change. Just as a circle has no end, the PDCA cycle should be repeated again and again for continuous improvement. When to Use Plan–Do–Check–Act ·          As a model for continuous improvement. ·          When starting a new improvement project. ·          When developing a new or improved design of a process, product or service. ·          When defining a repetitive work process. ·          When planning data collection and analysis in order to verify and prioritize problems or root causes. ·          When implementing any change. Plan–Do–Check–Act Procedure 1.     Plan. Recognize an opportunity and plan a change. 2.  ...

Cutting Quality Control & Re-cut procedure.

Cutting Quality Control: To be established a work process by which QC personnel able to run in a same path for continuous improvement.  The procedure can be control / feedback to cutting to produce smoothly & Good Quality production. Responsibility :  The responsible person in-charge of related department. Preparation for Bulk cutting: v   According cutting plan cutting Executive collects Approved sample, manufacturing order sheet, approved paper pattern / hard pattern & Marker paper with ratio chart. v   As per Order Qty. cutting Executive collects fabrics from WH & relaxes the fabric according estimated time. v   QA checks between ratio paper, marker paper, hard pattern & fabric inspection report. He confirms the marker with signature. v   QC makes mock up by style related parts to be check & ensure parts Shading. If have taken approval from Quality Manager or Merchandiser. v   According cutting plan ...

H&M SUPPLIER COLOR GUIDELINE

H&M has established this Colour Guideline to guide suppliers to achieve a quicker and better result in their colour work. For H&M Cosmetic products a separate Colour Guide Book is available. The guidelines and requirements in this Colour Guideline apply to all products in textile, leather/suede, plastic, bone, wood, metal, straw, paper etc. Colour evaluation using instrumental method should be used when applicable. All parts of a product are equally important to check according to the same guidelines; shell, details, accessories (including: threads, buttons, badges, zippers, interlinings, drawstrings, stoppers) etc. Therefore these guidelines are made for everyone involved in the colour process – garment makers, accessory suppliers, dyers, print houses, embroidery units etc. Each supplier to H&M is responsible for informing all of their suppliers and subcontractors about the content of these guidelines and requirements and to make sure that they al...