Traffic light inspection system
is the most useful tools in garment quality inspection. This system is used to
stop producing defect at source. This is a random inspection system.
Traffic light system is more effective in controlling shop floor quality
than other quality tools because of its visual communication. At the
same time it measure operator’s performance level in quality. No
operators like be presented themselves as lower quality makers. They
concentrate on quality aspect during stitching garments.
The format used for displaying as well as recording audit report. The
format is very simple to use and to understand. The format is printed on
a slightly thick sheet and hanged on the sewing machine. In this
system quality auditor visit operator’s workplace 4 times in a day
(considering 8 hours shift day) and inspects stitched garments and fill
circles with color according to the inspection result. In the initial
stage it instructed to inspect 7 pieces from the stitch garments
and if auditor found any defective piece respective circle to be filled
by RED color. If red color is marked on the inspection sheet, all
stitched pieces must be checked by auditor. And operator need to be
explained about the quality expected from him/her and how to get that
expected quality. In some case operators need more practice to get right
quality pieces.
Factory QAs later modified sample size, the rating criteria and added
yellow color keeping purpose right. Sample size is reduced as quality
auditor does not get 7 pieces at a time of inspection at most of the
workstations. This happens due to low work in process (WIP) in between
two work station.
Standard Sample Size: 5 pieces. Garment Inspection to be done after every two hours.
Color marking procedures: Circles will be filled with color
GREEN: If found No defect
YELLOW: If found 1 defect
RED: If found 2 defects
How to fill above TLS format:
The above format is used for a single operator or workstation. A single
sheet will keep record for the whole month for an operator. As a quality
auditor, on the first day of the month you have to fill details such as
Operator name, Operation name, Line number, Floor number and name of
the Month. Inspection instructions have been given on the format itself
with rating procedures. The format is displayed in two sections to cover
31 days (whole month). Write date in the cells of top row. Each column
contains 4 circles, represents four inspections in a day. After
inspection fill the respective circle (date and number of inspection of
the day) according to the rating criteria. At the end of the day quality
auditor has to sign report on below the circles.