Cutting Quality Control & Re-cut procedure.

Cutting Quality Control:

To be established a work process by which QC personnel able to run in a same path for continuous improvement. 

The procedure can be control / feedback to cutting to produce smoothly & Good Quality production.

Responsibility:  The responsible person in-charge of related department.

Preparation for Bulk cutting:
v  According cutting plan cutting Executive collects Approved sample, manufacturing order sheet, approved paper pattern / hard pattern & Marker paper with ratio chart.
v  As per Order Qty. cutting Executive collects fabrics from WH & relaxes the fabric according estimated time.
v  QA checks between ratio paper, marker paper, hard pattern & fabric inspection report. He confirms the marker with signature.
v  QC makes mock up by style related parts to be check & ensure parts Shading. If have taken approval from Quality Manager or Merchandiser.
v  According cutting plan cutting Quality Executive collects Fabric inspection report, shade band chart & separated the shades as per groups. Shade groups roll number he provides the Cutting Executive. Layer time cutting Executive follows accordingly.
v  According cutting plan cutting Quality Executive collects Fabric inspection report, shade band chart & separated the shades as per groups. Shade groups roll number he provides the Cutting Executive. Layer time cutting Executive follows accordingly.
v  QA ensures, fabric relaxation time is enough as per required hour.
v  Before cutting, QA Executive check Approved sample & present in PP meeting to be ensured that if there any new comments.
v  For new order cutting In charge cuts (pilot run) all sizes (50 – 200) pcs. After pilot run sewing completed QA Executive provides a report to cutting Executive with the comments bulk cutting permission.

Layering time:
v  Spreading time QI checks 10 points: *Table Marking * Ends *Leaning * Tension * Narrow Goods * Remnants * Counts * Fly height * Marker Placing * Fabric Fault. QC makes the reports as per finding. If any roll fails for layer time finding faults, QI declare the rolls for cut panel check.
v  QA also confirm that the layering roll is same shade.
v  QA checks inside roll quantity by calculating (lay length x lay qty.). If gets any shortage he makes roll inside short report & submit to cutting in charge.
v  QA also confirms that all layering rolls fabric width has family standard.

After cutting:
v  After cutting QI checks size wise Top, Middle,& Bottom  blocks (all parts) base on 5 points: * Pattern check. * Miss Cut. * Rugged Cut. * Notches. & * Marker Placing. If lot fails then QA makes report with percentage.
v  QA shows the report to cutting Executive / In charge. Acknowledge them with the signature.
v  Cutting In charge takes necessary steps for re- checking & rectify. After re check / rectify cutting in charge calls QA for re audit. QI takes re inspection; if lot accepts then lot allowed to making bundle. If lot again fails then QA share with QA Executive / Quality Manager, they will take necessary steps.

Bundling check:
v  After completed bundle in placed; QC’s takes size wise 1.5 AQL bundle & checks: Color, size, Quantity, left / right & bundle card. If found any one bundle mistakes, lot fails.
v  QC’s makes report & informs Cutting In charge. Cutting In charge takes necessary steps for re checking & rectification.  After re check / rectify cutting In charge calls QC’s for re audit. QC’s takes re inspection; if lot accepts then lot allowed passing to sewing Input.

Report:
v  QC’s responsible to make Daily Basis Report and to take sign, from cutting Manger and Cutting quality manager.
v  Daily record kept and analyzes data with review top 3 defect and find-out the actual root cause and to take corrective action with preventive measure. 
v  QC’s makes Cut panel inspection reject percentage report and inform to cutting In-charge.
v  If any rejection report comes from sewing floor QC’s verify that report & confirms the accuracy.

Re-cut procedure:
The purpose of this procedure is to ensure all non-conforming bundles are reprocessed at the cutting room.

This procedure applies to all cut fabric on all styles.

Responsibility and authority: the Technical Manager, Quality Assurance Manager and the 

Cutting Room Manager are responsible for ensuring this procedure is carried out.

PROCEDURE
v  When the cutting room auditor identifies a non - conformity she records it on the pattern inspection record document as a reject.
v  She then initiates the corrective / preventive action by filling in the cutwork rejection sheet.
v  The non-confirming work is placed in a secure marked cage.

Comments

Popular posts from this blog

H&M SUPPLIER COLOR GUIDELINE

H&M has established this Colour Guideline to guide suppliers to achieve a quicker and better result in their colour work. For H&M Cosmetic products a separate Colour Guide Book is available. The guidelines and requirements in this Colour Guideline apply to all products in textile, leather/suede, plastic, bone, wood, metal, straw, paper etc. Colour evaluation using instrumental method should be used when applicable. All parts of a product are equally important to check according to the same guidelines; shell, details, accessories (including: threads, buttons, badges, zippers, interlinings, drawstrings, stoppers) etc. Therefore these guidelines are made for everyone involved in the colour process – garment makers, accessory suppliers, dyers, print houses, embroidery units etc. Each supplier to H&M is responsible for informing all of their suppliers and subcontractors about the content of these guidelines and requirements and to make sure that they al

How Can Improve Production Quality

To become quality conscious, it might look at improving existing quality standards at various stages of manufacturing process. Producing a good quality product is a result of combined efforts of management, employees and workers by developing system, implementing good practices in floor and setting up standards.  Following tips can help to improve quality at production. Communicate the importance of quality production to your employees and floor workers, and explain quality expectations by the management.  Maintain a clean and dry workplace, including storage rooms and shipping areas.  Select and utilize appropriate equipment in cutting, sewing and finishing processes.  Provide appropriate tools, machines and equipment to each department. Provide on-the-job training to workers for new comer with existing.  Plan an ongoing program for machine maintenance.  Establish agreed-upon quality standards with all fabric suppliers before purchase