When
end customers or consumers purchase a garment they look for quality
first. So, to have a satisfied customer, retailers must keep only
quality product in their shops. For defective goods supply Buyer can penalize supplier & It
might cost the factory lot of money and goodwill. So the manufacturers
take care for garment quality at each stage of production. In maximum
cases buyer inspects shipment at factory before accepting the finished
garments. Whatever defects found in the final inspection, it is the
cumulative figure of previous processes. So it is very important to
rectify defective pieces at process where it occurred instead of in the
finishing.
Lot of people and machines are involved in
producing a garment for this defect may come. There is an obvious chance of making few faulty
garments in a batch due to faulty machine or human intervention. The
defective pieces can be corrected by repairing or changing defective
parts. But re-work costs money and time. These both increase
inefficiency of the company. And if one defect passed through initial
process without detecting and correction and process goes on then at the
later stages repair cost will be much more than detecting it in initial
stage.
Production process starts after receiving of fabrics and end after
dispatching of packed garments. Generally export house put quality check
points at the end of each process to ensure that only quality pieces
move to the next process. Department wise quality check points have been
explained in the following.
Fabric Store
|
100% fabric inspection with 4 point system.
|
Trim & accessories
|
- Trims inspection Trim supplier & factory both side (100% : 10%)
|
Cutting Room
|
Marker checking
Cut parts checking or audit
Bundle inspection
|
Printing and Embroidery
|
100 % inspection of printing & embroidery panels
|
Sewing Department
|
Inline check point (at critical operation)
Roaming checking (Random checking)
Needle point check (Traffic Light System)
End of Line checking (100%)
Audit of checked pieces
|
Finishing Department
|
Initial finishing inspection
2 Hours Carton complete goods Audit
Final finishing inspection
Internal shipment audit
|
- Fabric Store: In the fabric store fabric is being checked before issuing it to cutting department. In general not all the fabric is checked. Usually 10% of fabrics are checked for good fabric suppliers. For power loom fabric and printed fabric 100% checking is done. Fabrics are checked in flat table, flat table with light box or on fabric checking machine. 4 point system for fabric inspection is used to measure the quality level of the incoming fabric.
- Trims & Accessory: Trims quality is also very important for having a quality garment. Trims inspection is done randomly against the given standards, like color matching. But for trims and accessories quantity checking is essential.
- Cutting Room: It is said that cutting is the heart of production. If cutting is done well then chances of occurring defects in the following processes comes down. In cutting room, check points are – i) marker checking, ii) cut part audit and iii) bundle checking.
- Printing & Embroidery Checking: Printing & embroidery is not a compulsory process. If printing & embroidery is done in fabric form then printing & embroidery is being checked in fabric store. For knits garment, maximum printing & embroidery is done in cut panels. So before issuing cuttings to sewing department, each panel is being checked properly. Defects that are found here is print & embroidery placement, color matching, misprint or print overlapping or shade variation.
- Sewing Department: Checkpoints in the sewing departments are as following.
- Inline inspection: In assembly line generally check pints are kept for the critical operations. In these checkpoints, 100% checking is done for partially stitched garments and defect free pieces are forwarded to the next process. This type of checking is used for high value garment.
- Roaming inspection: In this case checkers roam around the line and randomly check pieces at each operation.
- Traffic light inspection system: Very few garment manufacturer use this inspection system. In this system each operator is given a card for measuring their quality performance. Quality checker goes to the operator and do random check for few pieces and according to the inspection result, checker marked red or green on the card following rating criteria.
- End of line inspection or table checking: A checker checks completely stitched garment at the end of the line. 100% checking is done here,
- Audit of the checked pieces: Very few manufacturers follow this audit procedure but it is very essential checkpoint to assure that only 100% inspected garment are sent to finishing from sewing department. And all defective pieces are repaired before sending to finishing.
7. Finishing Department: Check points in finishing department consists
- Initial finishing inspection: checking done prior to pressing of the garment at finishing room is known as initial finishing.
- Final finishing Inspection: After pressing garments are again checked and passed for tagging and packing.
- Hourly Complete Carton Audit: Every 2 - 4 hours (As buyer requirement) Supplier QC dept. done this audit to ensure the hourly complete carton quality.
- Internal final audit: After garments are packed up to certain quantity, quality control team, do audit of packed garments. This process is carried out to ensure that before handing over shipment to buyer QC