How to do Fabric & Trim inspection.

Fabric Inspection:

To ensure that Fabric Quality are checked in a standard way and that inspection is accepted before sending to Production Lines

This procedure applies to all Fabric from all Buyers and suppliers.

Responsibility: Fabric Store Manager, Quality Manager, Production Manager, Merchandising Manager, Supply Chain Manager

Procedure:
v  Upon arrival of Fabrics in Warehouse, it is kept in Quarantine zone
v  Warehouse issues a Fabric Inspection Request of the same to QAD.
v  Fabric Quality Assurance Inspector checks the packaging – Check Moisture Level where applicable. Select the number of Roll to be inspected according to 4 point system
v  The QA then pick quantity to be inspected from Roll:
v  Small quantities up to 1000 MTR are 100% checked.

v  The approved Trim cards and related documents like CMS are based upon for Inspection benchmark.
v  Defects List is referred to for Critical –Major and Minor defects.
v  After Complete the inspection QA will make the positive realize letter and Acceptable Fabrics handover to Fabric warehouse responsible. He will keep the all goods on rack separately buyer wise and style wise.
v  If fail after inspection inform to senior, he will take necessary step.   

Monitoring: Fabric QA manager will monitor if have any discrepancy shall be investigation and appropriate corrective action taken.





Trim Inspection:

To ensure that Trims Quality is checked in a standard way and that inspection is accepted before sending to Production Lines.

This procedure applies to all trims from all Buyers and suppliers.

Responsibility: Store Manager, Quality Manager, Production Manager, Merchandising Manager, Supply Chain Manager





Procedure:
v  Upon arrival of accessories in Warehouse, it is kept in Quarantine zone
v  Warehouse issues a Trims Inspection Request of the same to QAD.
v  Trims Quality Assurance Inspector checks the packaging – Check Moisture Level where applicable.

Select the number of packages to be inspected according to AQL Chart.
v  The QA then pick quantity to be inspected from packages:
v  According to AQL 2.5 level II for countable Items.
v  More than 1000 meters 10 % check for non-countable items -allowing 2% defect.
v  Less than 100 Pcs Consignment to do 100% checking at AQL.
v  Up to 1000 meters of consignment do 100% checking.
v  Minimum sample quantity will covered full size range & all batches for inspections.
v  The approved Trim cards and related documents like CMS are based upon for Inspection benchmark.
v  Defects List is referred to for Critical –Major and Minor defects.
v  After Complete the inspection QA will make the positive realize letter and Acceptable goods handover to trims warehouse responsible. He will keep the all goods on rack separately buyer wise and style wise.
v  If fail after inspection inform to senior, he will take necessary step.  

Monitoring: Trims QA manager will monitor if have any discrepancy shall be investigation and appropriate corrective action taken.

Comments

Popular posts from this blog

H&M SUPPLIER COLOR GUIDELINE

H&M has established this Colour Guideline to guide suppliers to achieve a quicker and better result in their colour work. For H&M Cosmetic products a separate Colour Guide Book is available. The guidelines and requirements in this Colour Guideline apply to all products in textile, leather/suede, plastic, bone, wood, metal, straw, paper etc. Colour evaluation using instrumental method should be used when applicable. All parts of a product are equally important to check according to the same guidelines; shell, details, accessories (including: threads, buttons, badges, zippers, interlinings, drawstrings, stoppers) etc. Therefore these guidelines are made for everyone involved in the colour process – garment makers, accessory suppliers, dyers, print houses, embroidery units etc. Each supplier to H&M is responsible for informing all of their suppliers and subcontractors about the content of these guidelines and requirements and to make sure that they al...

QUALITY MANAGEMENT SYSTEM GUIDELINES FOR SUPPLIERS BY H&M

Introduction Congratulations! If you are not already working with a quality management system, you will now get some ideas about how you can improve effectiveness and customer satisfaction in your company. H&M aims to build long-term co-operation with suppliers that take ownership in creating a sustainable system and organisation to ensure the H&M group quality requirements and continuously improve the quality for the long term in the factories. A management system is a complement to the RQS. Table of Contents Introduction ......................................................................................... 1  1. Definition of a Management System .................................................... 4  2. Key Success Factors ......................................................................... 5  3. Benefits .......................................................................................... 6  4. Limitations.....

Traffic Light System

Traffic light inspection system is the most useful tools in garment quality inspection. This system is used to stop producing defect at source. This is a random inspection system. Traffic light system is more effective in controlling shop floor quality than other quality tools because of its visual communication. At the same time it measure operator’s performance level in quality. No operators like be presented themselves as lower quality makers. They concentrate on quality aspect during stitching garments. The format used for displaying as well as recording audit report. The format is very simple to use and to understand. The format is printed on a slightly thick sheet and hanged on the sewing machine. In this system quality auditor visit operator’s workplace 4 times in a day (considering 8 hours shift day) and inspects stitched garments and fill circles with color according to the inspection result. In the initial stage it instructed to inspect 7 pi...